Installation works
Installation, repair of manufacturer defects and isolation works of Expansion vessel (47tn, L 19m) and Gas-Oil tank (23tn, L 15m). KPA Unicon OY. Norrköping Sweden
Installation, repair of manufacturer defects and isolation works of Expansion vessel (47tn, L 19m) and Gas-Oil tank (23tn, L 15m). KPA Unicon OY. Norrköping Sweden
Boiler house flue gas pipes manufacturing and equipment installation. Rakvere, Estonia. Material S235JR
Assembly of distillation column, welding two parts together on site in Leuna, Germany, UPM Biochemicals GmbH. Length of column 60m, weight 150tn. Material AISI 304L. THK 20mm
Pickling and passivation of Exhaust Gas Cleaning Systems on cruise ships. Work was performed around the world.
Equipment installation and commissioning for Baltania wood pellets factory. Mechanical installation of the dryer island equipment supplied by Teal Sales Incorporated. Total weight 520 tn.
Manufacturing of Chemicals storage container with retention 1100 litters, HVAC and firefighting system.